Hever Station Emergency Cutting Works
CK Rail safely completed over 6,500 hours of emergency work to repair and strengthen a railway cutting at Hever station in Kent. Engineers were onsite within two hours of reports a landslip had occurred south of platform 1 at the station on the Uckfield branch of the Oxted line. An initial incident survey and report […]